Jump to content

Port Potato: Difference between revisions

38 bytes added ,  10 August 2022
m
Line 313: Line 313:
Note: The reason smaller ships have less spots, is due to larger ships having priority; however many more smaller ships like dhows or even brigs can anchor in the harbor instead of at a pier.)
Note: The reason smaller ships have less spots, is due to larger ships having priority; however many more smaller ships like dhows or even brigs can anchor in the harbor instead of at a pier.)


* Current Total Plots: 41 (including the under construction; excluding some Port lands not described as a "plot")
* Current Total Plots: 34 (including the under construction; excluding some Port lands not described as a "plot")
* Current Unused/Unbuilt Plots: 15
          *Current Standard (13x17) Plots: 22
* Current Under Construction (soon to be) Plots: 7
* Current Unused/Unbuilt/Unplanned to be used Plots: 9
* Currently Open to own: 7
* Current Under Construction (soon to be) Plots: 0
* Current Farming/livestock plots: 10
* Currently Open to own: ''Undecided''
* Current Housing Plots: 6
* Current Farming/livestock plots: 5
* Current Housing Plots: 7


Current Planned additions: 4 Plots (South), 3 Plots (South East), make all docks claimed to be rented out (most likely free rent) and able to dock a ship in.
Current Planned additions: Make all docks claimed to be rented out (most likely free rent) and able to dock a ship in.


===Info on the Canal===
===Info on the Canal===
755

edits