Jump to content

Port Potato: Difference between revisions

154 bytes added ,  5 October 2021
m
Line 224: Line 224:
====(10/4/2021)====
====(10/4/2021)====
Due to how narrow Potato Bay is, many docks have been canceled. The Bay will now be more of a mooring spot then docks. 2 full sized docks will still be installed at South-East Port Potato. The Northern Coast of Southern Port Potato is planned to take 1 50x27 ship, and many dhows/schooners. (These smaller ships will have a dedicated spot to be moored.
Due to how narrow Potato Bay is, many docks have been canceled. The Bay will now be more of a mooring spot then docks. 2 full sized docks will still be installed at South-East Port Potato. The Northern Coast of Southern Port Potato is planned to take 1 50x27 ship, and many dhows/schooners. (These smaller ships will have a dedicated spot to be moored.
====(10/5/2021)====
Today, the Easternmost Southern Pier is complete, allowing a 27x50x6 ship to dock, and/or many [[dhows]]/[[schooners]]/smaller ships.


==Images below==
==Images below==
755

edits