Jump to content

Port Potato: Difference between revisions

12 bytes added ,  23 September 2021
no edit summary
Tags: Mobile edit Mobile web edit
No edit summary
Tags: Mobile edit Mobile web edit
Line 161: Line 161:
The [[DNS Southernly Gale]] was rushed back to [[Visitopia]]. She was converted at sea months ago to blockade the CSN *insert name here* 4th rate ship of the line. She was hidden behind an old forgotten naval fortress. She is now in[[Visitopia]]'s main harbor, with her fate either scraping or to be sent to Port Potato, either as a museum ship, or parts ship. She has been dubbed not fit for war.
The [[DNS Southernly Gale]] was rushed back to [[Visitopia]]. She was converted at sea months ago to blockade the CSN *insert name here* 4th rate ship of the line. She was hidden behind an old forgotten naval fortress. She is now in[[Visitopia]]'s main harbor, with her fate either scraping or to be sent to Port Potato, either as a museum ship, or parts ship. She has been dubbed not fit for war.


== Expansion Era III ==
=== Expansion Era III ===


=== 21/8/2021 ===
==== 21/8/2021 ====


Port Potato has started a new project, as apart of the Expansion Era III project; to build a tunnel to connect the two halves of Port Potato to allow for easier access. It was decided to not be ocean level, as it would block the insignificant river and a few non-Port Potato ships into a small "lake". (As so far we have no intel suggesting they are submersible.)
Port Potato has started a new project, as apart of the Expansion Era III project; to build a tunnel to connect the two halves of Port Potato to allow for easier access. It was decided to not be ocean level, as it would block the insignificant river and a few non-Port Potato ships into a small "lake". (As so far we have no intel suggesting they are submersible.)
Line 174: Line 174:




=== 22/8/2021 ===
==== 22/8/2021 ====


Tunnel and drydocks complete.
Tunnel and drydocks complete.
Line 182: Line 182:
8:03 PM (EST) Port Potato's Toll Canal has been Decommissioned.
8:03 PM (EST) Port Potato's Toll Canal has been Decommissioned.


=== 2/9/2021 ===
==== 2/9/2021 ====


The Hawt_Sauce Incident is underway, as a deckie is currently blocking some plots with claims. Matters are being delt with as we speak.
The Hawt_Sauce Incident is underway, as a deckie is currently blocking some plots with claims. Matters are being delt with as we speak.
Line 188: Line 188:
Port Potato has also now offered to exchange donations for having street names named after you. Feel free to /mail or DM DeDerpyDerp__ for applications.
Port Potato has also now offered to exchange donations for having street names named after you. Feel free to /mail or DM DeDerpyDerp__ for applications.


=== 5/9/2021 ===
==== 5/9/2021 ====


Hawt_Sauce's claims are gone; and now the Southern Pier is complete; along with the expansion of the canal to a uniform depth of 6 blocks. As of now, any ship that is no deeper then 6 blocks underwater; and 27 blocks INCLUDING FENCES wide can go through the canal. Above 3 blocks above the waterline; sails could theoretically be as wide as you wish; within reason.
Hawt_Sauce's claims are gone; and now the Southern Pier is complete; along with the expansion of the canal to a uniform depth of 6 blocks. As of now, any ship that is no deeper then 6 blocks underwater; and 27 blocks INCLUDING FENCES wide can go through the canal. Above 3 blocks above the waterline; sails could theoretically be as wide as you wish; within reason.


=== 21/9/2021 Update ===
==== 21/9/2021 Update ====


Port Potato has mostly finished construction of her first Capital Ship, and Carrier. The yet to be named Unnamed Heavy/Fleet Carrier Design A-2; from the Creative Server. All that is left is to troubleshoot her auto cannons.
Port Potato has mostly finished construction of her first Capital Ship, and Carrier. The yet to be named Unnamed Heavy/Fleet Carrier Design A-2; from the Creative Server. All that is left is to troubleshoot her auto cannons.
755

edits