Port Potato: Difference between revisions

7 bytes removed ,  30 November 2021
m
no edit summary
mNo edit summary
Line 266: Line 266:
Current Planned additions: 4 Plots (South), 3 Plots (South East), make all docks claimed to be rented out (most likely free rent) and able to dock a ship in.
Current Planned additions: 4 Plots (South), 3 Plots (South East), make all docks claimed to be rented out (most likely free rent) and able to dock a ship in.


======
===Info on the Canal===
===Info on the Canal===
The canal is 27 wide at the water line, being 6 blocks deep. She is navigable to almost any ship, with no known length limitations, besides the turns to get through the canal. Please review the live map to judge if your ship will fit.  
The canal is 27 wide at the water line, being 6 blocks deep. She is navigable to almost any ship, with no known length limitations, besides the turns to get through the canal. Please review the live map to judge if your ship will fit.  
755

edits