271
edits
Minemoppel (talk | contribs) |
Minemoppel (talk | contribs) |
||
Line 73: | Line 73: | ||
===Harbour=== | |||
<span style="color:gray">''this topic will be added soon''</span> | <span style="color:gray">''this topic will be added soon''</span> | ||
===TV1-Studios=== | |||
<span style="color:red">''TV1 will end its operations '''tomorrow''', at least for several weeks. There is only one remaining show on Wendsday!''</span> | <span style="color:red">''TV1 will end its operations '''tomorrow''', at least for several weeks. There is only one remaining show on Wendsday!''</span> | ||
Line 83: | Line 83: | ||
===Central Bank of Mithlond (CBM)=== | |||
<span style="color:gray">''this topic will be added soon''</span> | <span style="color:gray">''this topic will be added soon''</span> | ||
===Nether portal=== | |||
<span style="color:gray">''this topic will be added soon''</span> | <span style="color:gray">''this topic will be added soon''</span> | ||
===XP-farm=== | |||
<span style="color:gray">''this topic will be added soon''</span> | <span style="color:gray">''this topic will be added soon''</span> | ||
===Brewery=== | |||
<span style="color:gray">''this topic will be added soon''</span> | <span style="color:gray">''this topic will be added soon''</span> | ||
===Agro facilities=== | |||
<span style="color:gray">''this topic will be added soon''</span> | <span style="color:gray">''this topic will be added soon''</span> | ||
===Mithlond Subway=== | |||
The Subway of Mithlond was a prestigious project at its time. The public subway was founded on June 2018 and ended services in February 2019. There was a total amount of 6 stations and 2 subway lines (U1, U2) but only the U1 was ever operated, the U2 never was finished. It was based on a old subway system that was used to transport items and persons in case of a long siege. 100m of tunnel costed around 250 Taler, that was way to expensive. Also sometimes the time you were waiting on the station took longer than the whole traveled way would have taken by foot. Additionally the technic was very susceptible to interference. Mainly because of these reasons the project was aborted while the U2 has been built. | The Subway of Mithlond was a prestigious project at its time. The public subway was founded on June 2018 and ended services in February 2019. There was a total amount of 6 stations and 2 subway lines (U1, U2) but only the U1 was ever operated, the U2 never was finished. It was based on a old subway system that was used to transport items and persons in case of a long siege. 100m of tunnel costed around 250 Taler, that was way to expensive. Also sometimes the time you were waiting on the station took longer than the whole traveled way would have taken by foot. Additionally the technic was very susceptible to interference. Mainly because of these reasons the project was aborted while the U2 has been built. | ||
edits